Page 7 - Sentinel March 2018
P. 7

WORDS Continued from page 6                               Sushi Restaurant behind the
                                                                  old court house has stabilized
                                      the results of citizen sur-  its soil and is continuing con-
                                      veys in its plans.  It directs   struction  and  the  midrise
                                      attention  to  immediate    Fifth  Street  Apartments
                                      community  needs  along     (68) are under plans review.
                                      with provisions for future   The Eternal Rock Evangeli-
                                      changes,  while  recogniz-  cal Church is renovating the old Steele Tire Building across
                                      ing  that  resident  popula-  from the Library.
                                      tion  will  remain  stable.
        Water, sanitation, development (primarily small commercial),   AROUND TOWN – Other activity around town includes the
        possible  land  owner  requested  annexations,  traffic  consider-  Auburn Ridge development, Liggett Road self-storage, Castle
        ations, and the overwhelming desire of all area residents to re-  Rock Health Campus on S. Perry St., Crystal Valley Parkway
        tain the small community aspect of Larkspur are all analyzed   Fire Station #152, AND the World Compass Academy expan-
        and planned.  Good document and one that town and surround-  sion (I25 frontage @ S. Perry), Miller’s Landing (65 acres).
        ing neighbors should take a moment to read (located under De-
        partments - Planning- Master Plan).
                                                                                            Charter  schools  continue  to
                                                                                            serve  the  growing  communi-
        CASTLE ROCK –  The construction outlook for 2018 looks                              ty.  The Kingsway Christian
        even greater than last year.  Some of the activity either under-                    Academy  beat  to  operation
        way or ready to start including:
                                                                                            the  Apex  Charter  School,  by
                                                                                            remodeling the former Play It
        PROMENADE  -    7  Eleven,  Car  Wash,  Chick  Filet,  Del                          Again Sam’s and Gym build-
        Taco, La Loma Mexican                                     ing adjacent to I-25 at 4760 Castleton Way. Kingsway had a fall
        Restaurant, Old Chicago                                   opening and now have nearly 100 students in their preschool
        Restaurant, Les Schwab                                    through 8th grade program.  Kingsway is “bible-based school
        Tire  Center,  Ross  and                                  open to Christian and non-Christian families.”
        Hobby Lobby, and Star-
        bucks  plus  more.    As                                                                   Continued on page 7
        they progress we will tell

                                more individually.  The Famous
                                Steakhouse is under construction
                                for  its  occupancy  of  the  former
                                Joey  Edge  building  across  from
                                Kneaders, and Culver’s will also
                                join the restaurant roster nearby,
                                adjacent  to  Arby’s.  Smoothie
        King is open a couple of doors down from the Pot Belly Res-
        taurant.

        MEADOWS -  Also lots of activity with completions and new
        starts  of  commercial  and
        residential.  The Hospital is
        planning a healing garden,
        the  Collaboration  Col-
        lege Campus continues its
        planning  stage.    The  self-
        storage complex on Mead-
        ows by the tracks is nearing
        completion and at the Town Center, the Apex Charter School
        is underway,CVS Pharmacy is in the site planning stage, and
        the single and multi-family additions currently appear unend-
        ing.  In addition to the new Car Wash at the Promenade, another
        is planned on Meadows Parkway near the train bridge.

        DOWNTOWN CASTLE ROCK – Not to be left out, the Riv-
        erwalk mixed use project is at full steam, the Wild Blue Yon-
        der addition to Augustine’s should start soon.  The Okinawa
                                                                               Perry Park Sentinel March 2018 - Page 7
   2   3   4   5   6   7   8   9   10   11   12